upper-casing-installation
Drilling one of the 9 deep recovery wells through dry bedrock to 40 feet depth to relieve the artesian water pressure.
Drilling one of the 9 deep recovery wells through dry bedrock to 40 feet depth to relieve the artesian water pressure.